Outdoor Kitchen Complete!
Options

Goldy
Everyone, Registered Users Posts: 1,636
There are about 6 small things that need to get finished on this project before I offically call it good but its close enough to post a pic. It only took about 10 days of actual work mostly because I was winging everything. My wife and I decided on a general floor plan and then the building and designing started. I wanted some character built into this thing so I installed two hidden drawers on the front so you need to know what brick to pull to open it.
The best part about this build is that I have ZERO buidling experience and almost every aspect of this build was a first for me and its still standing! A big thanks to Home Depot's staff!
Anyway, here is the before
IMG-20120519-00028
And the after
IMG-20121022-00257
The best part about this build is that I have ZERO buidling experience and almost every aspect of this build was a first for me and its still standing! A big thanks to Home Depot's staff!
Anyway, here is the before

And the after

Comments
-
Nice setup.
-
Beautiful job, and what an improvement!
-
Awesome job Goldy!
-
Very nice addition, Goldy! Especially for not knowing a lot about construction. Great job!:-)
-
very nice!!
-
Shweeet
-
I worked construction for roughly 10yrs, and that is one of the nicest remodels I've seen. Very creative by putting brick on the hidden drawers. Excellent job, my friend.
-
D A M N, can u come do mine, lol, very sweet setup.
-
Wow...very nice. Thanks for sharing.
-
Very nice! It would take me 10 days just to get those rocks arranged correctly lol.
-
Damn nice